Skip to main content

About Kebri Beyah

A highland market town on the Jijiga–Degehabur road in Fafan Zone

Kebri Beyah (Somali: Qabribayax), often written Kebribeyah, is a town about 50 km south-east of Jijiga in Fafan Zone of the Somali Region. It sits on a low ridge between the open Jijiga Plains to the north and east and the Jarar (Jerer) valley to the south and west, at roughly 1,700 metres above sea level. The main A10 highway between Jijiga and Degehabur runs through the town centre, and a side road leads towards Hartisheik and the border with Somaliland.

The town has its own city administration, one of six in the Somali Region, and is surrounded by the wider Kebri Beyah woreda. It is a local market hub for livestock, food and household goods. Since about 1989–1991 it has also hosted a refugee settlement next to the town centre, which UNHCR counted at about 22,800 people in October 2026. The town has grown quickly: its built-up area roughly doubled between 2006 and 2019. Studies in 2020 and 2025 both found that water shortage is a top concern for residents.

Climate

Kebri Beyah is semi-arid and much drier than Jijiga, even though the two towns are only about 50 km apart. A JICA study gave about 270 mm of rain a year at the Kebri Beyah station. It recorded an average daily high of about 27 °C and an average low of about 14 °C. Modelled data for the town (1995–2024) give a similar total of about 295 mm a year, with mild average temperatures of 18–21 °C in every month. Rainfall varies a lot from year to year. Drought is the most common hazard, and heavy storms can cause local flash floods. Many households store rainwater in birkas (lined water pits).

Most rain falls in two periods: the main rains in April and May, and shorter rains around October. December to February is the driest part of the year.

March is usually the warmest month on average (about 21 °C), closely followed by April and September. Afternoon highs are near 27–28 °C in February and March. December and January have the coolest nights, around 12 °C.

Economy

Kebri Beyah is a market town on the main highway between Jijiga and the southern Somali Region. It also lies on trading routes towards Somaliland. Livestock is the backbone of the regional economy. Jijiga and Kebri Beyah serve as market hubs for livestock, food and other goods, and the town has a livestock market on its southern edge. A 2001 farm survey of the woreda found that most farmers both grew crops and kept livestock. Cereals such as sorghum, maize and teff covered about 61% of the surveyed land, and khat was the main permanent crop. In town, people make a living from formal and informal work. The 2007 census recorded an unemployment rate of 18.9% in the town.

Where your water comes from

No large river near Kebri Beyah flows all year; the Jarar is a seasonal wadi. For decades the town's piped water came from deep boreholes in the Jarar (Jerer) valley, and wells in Kebri Beyah woreda average about 220 m deep. In 2010 UNHCR switched the valley pumps from diesel to grid power. In 2013 a JICA study described water passing through an iron-removal plant and being pumped up about 330 m, via a booster station, to the town reservoir. From there about 11 km of town pipes carried it on. None of the 20 public taps in the town was working well at that time, while the 48 taps in the refugee camps worked. From December 2018 the old Jarar system stopped delivering water. The network was linked to the Dhuruwalle scheme, which the regional water bureau commissioned in 2016, but in 2020 it met only about a tenth of daily need.

In 2020 the piped system also relied on funding from UNHCR and the government refugee agency. Water was free and no fees were collected. A 2025 survey for UNHCR assessed twelve water points in the refugee camp zones, all old boreholes built by NGOs between 1983 and 2008. Water quality was poor or very poor at all but one, most were almost never available, and none charged a fee. Rainwater was the main source for 43% of host households, and only 17% of host respondents said they had clean water, although 71% treated their drinking water. When piped water fails, many families, especially in the refugee settlement, rely on private or public birkas (lined rainwater pits), often at a cost. In 2020 a 20-litre jerrycan cost about 10 birr.

A UNICEF and UNHCR programme (R-WASH, funded by BMZ/KfW, Xylem and other partners) is building a utility-managed water system; construction in Kebribeyah was about 30% complete at its 2025 midline review.

History

  1. 1960s

    In 1964 Kebri Beyah was the centre of Kebri Beyah woreda and of the Gilo sub-district, and had a sub-post office.

    Sources (1)
  2. 1989–1991

    A camp was set up beside the town for refugees and returnees from Somalia, at first for about 10,000 people (sources give 1989 or 1991).

    Sources (2)
  3. 1990s

    Through the 1990s the camp population stayed at just over 10,000 people (between about 10,100 and 12,600 in UNHCR counts). Water was trucked to the camp from UNHCR boreholes in the Jarar (Jerer) valley. UNHCR later built a piped system that carried water about 22 km from the valley boreholes to the town, designed for about 5,000 people.

    Sources (2)
  4. 1997–2007

    UNHCR closed the other refugee camps in the Somali Region between 1997 and 2005, but the Kebri Beyah camp stayed open. New arrivals pushed its population to about 16,000–17,000, and in 2007 about 4,000 refugees moved to a reopened camp at Teferi Ber.

    Sources (2)
  5. 2006–2019

    The town grew fast. UN-Habitat estimated that the built-up area grew from about 2.5 km² in 2006 to about 5.4 km² in 2019.

    Sources (1)
  6. 2007

    The national census counted 11,481 people in the town and 165,518 in the whole woreda.

    Sources (1)
  7. 2010

    UNHCR completed a USD 5 million project for the Jarar Valley water scheme. It extended grid electricity to the valley so that water could be pumped from seven wells, supplying about 1.3 million litres a day to some 51,000 people, including about 16,000 refugees and residents of the town. Before this, tanker trucks had brought water to the camp.

    Sources (1)
  8. 2011

    A structure plan (master plan) for the town was prepared in 2011. Its ten-year legal term ended in 2021, and a 2025 review called for a full revision.

    Sources (2)
  9. 2012–2013

    A JICA study with the Somali Regional Water Resources Development Bureau drilled new wells, replaced booster pumps and planned improvements to the Jarar valley system that supplies the town.

    Sources (1)
  10. 2016–2020

    The regional water bureau commissioned the Dhuruwalle (also spelled Dhurwalle) water supply system in 2016 to serve the town and nearby settlements. From December 2018 the older Jarar Valley system stopped delivering water, and the town network was connected to the Dhuruwalle system.

    Sources (1)
  11. 2020s

    Kebri Beyah is one of six city administrations in the Somali Region, separate from the surrounding Kebri Beyah woreda. A 2025 assessment for UNHCR lists a government primary hospital in the town, built in 2021.

    Sources (2)
  12. 2025–2028

    A 2025 assessment for UNHCR reviewed health, education, water and housing for both the host and refugee communities. In November 2025 the European Union and UNHCR launched the ARISR project in Kebribeyah, with EUR 12 million from the EU (about EUR 14.3 million in total), running to September 2028. It covers housing, education, health, solid waste and planning, including an update of the town's master plan.

    Sources (3)

Population

Figures come from different publishers and counting methods, and are shown as published. Censuses count people; estimates and projections are calculated.

Places to know

Historic places, landmarks, markets and nature around the city.

  • Market

    Town centre and main market streets

    The commercial and administrative heart of the town lies along the main highway, with a small but lively network of shopping side streets behind it. The central zones of the refugee settlement are within about 30 minutes' walk, and their residents rely on the town's shops and services.

    Sources (1)
  • Transport

    Bus station

    Private buses to Jijiga and beyond leave from the bus station on the northern edge of town.

    Sources (1)
  • Health

    Government health centre

    A local-government health centre. It serves both the host and refugee communities. In 2020 UN-Habitat reported plans to upgrade the government health centre to a hospital with World Bank DRDIP funding.

  • Health

    Refugee settlement health centre

    A primary health centre inside the refugee settlement. In 2020 it was run by the government refugee agency (ARRA), and host residents could use it free of charge. A 2025 assessment names it the Medical Teams International health centre, run by a UN agency with NGOs.

  • Health

    Kebribeyah Primary Hospital

    A government primary hospital in the town, built in 2021 according to a 2025 assessment for UNHCR. The same assessment found its building in good condition.

    Sources (1)
  • Education

    Dr Abdulmajid Hussein Primary School

    A government primary school on the north-western side of town.

  • Education

    Kebribeyah Primary School

    The EU and UNHCR ARISR project (2025–2028) plans to support new classroom blocks, a library and related facilities at this school, as part of work to improve education for refugee and host-community learners.

  • Mosque

    Main mosque in the refugee settlement

    The population is mainly Muslim and uses several large mosques. A new main mosque was built shortly before 2020 at a central spot in the refugee settlement.

    Sources (1)
  • Nature

    Jarar (Jerer) Valley

    The valley south and west of town drains towards the Fafan and Wabi Shebelle river system. Its river is a seasonal wadi that flows mainly after rain. Deep boreholes in the valley supplied the town's piped water from the 1990s until the old system stopped delivering water in December 2018.

  • Nature

    Jijiga Plains

    Open plains of rain-fed cropland and grassland stretch north and east of the town. Whether a field is planted depends on the rains, and fallow fields soon turn back to grassland.

    Sources (1)
  • Water

    Dhuruwalle water supply system

    A water scheme built by the Somali Region Water Resources Development Bureau and commissioned in 2016 for the town and nearby settlements. In 2020 it supplied only about 100 m³ a day against an estimated need of about 997 m³.

    Sources (1)

City map

Streets, or satellite imagery down to individual buildings.

Loading the map…